RESULTS SHOWCASE

FRONT PAGE > CASE >

PROJECT

Huangshan Kitchen Biogas Residue Drying Project

11 June 2023

微信图片_20230220102120-scaled.jpg
安徽黄山1.png

The project is a kitchen biogas residue project contracted by TIC Technology Co., Ltd.. The total daily sludge treatment scale of Huangshan City Wastewater Treatment Plant Sludge and Food Waste Disposal Project is 120t/d (the moisture content of municipal sludge is about 80%), equipped with a sludge dryer, and successfully accepted in January 2021.